preview
No transcript available
No transcript available
No transcript available
No transcript available
No transcript available
No transcript available
I wonder if animals ever have prophetic dreams.
The follow-up dream “at school with no pants on” was heralded as a classic.
I wonder if animals ever have prophetic dreams.
The follow-up dream “at school with no pants on” was heralded as a classic.
www.patreon.com/exocomics/…/come-here-173415694
My cat does this to me ALL. THE. TIME. For some reason he really likes getting pats at the top of the stairs. When he’s bored, he goes there and yells loudly until I come and purrs happily while I pat him. What a little weirdo :)
www.patreon.com/exocomics/…/come-here-173415694
My cat does this to me ALL. THE. TIME. For some reason he really likes getting pats at the top of the stairs. When he’s bored, he goes there and yells loudly until I come and purrs happily while I pat him. What a little weirdo :)
Kroger’s $1.65 billion proposed acquisition of Giant Eagle might not only consolidate the grocery market, but also a vast surveillance network that includes Flock cameras, a new report warns. Beyond standard concerns that a merger could decrease competition and increase prices, the American Economic Liberties Project (AELP), which advocates for competition policy reforms, says that…
Kroger’s $1.65 billion proposed acquisition of Giant Eagle might not only consolidate the grocery market, but also a vast surveillance network that includes Flock cameras, a new report warns. Beyond standard concerns that a merger could decrease competition and increase prices, the American Economic Liberties Project (AELP), which advocates for competition policy reforms, says that…
Kroger’s $1.65 billion proposed acquisition of Giant Eagle might not only consolidate the grocery market, but also a vast surveillance network that includes Flock cameras, a new report warns. Beyond standard concerns that a merger could decrease competition and increase prices, the American Economic Liberties Project (AELP), which advocates for competition policy reforms, says that…
Kroger’s $1.65 billion proposed acquisition of Giant Eagle might not only consolidate the grocery market, but also a vast surveillance network that includes Flock cameras, a new report warns. Beyond standard concerns that a merger could decrease competition and increase prices, the American Economic Liberties Project (AELP), which advocates for competition policy reforms, says that…
Big high-speed rail collision in Spain.
The first information about the circumstances of the Urda (Toledo) railway accident points to the trains involved, the AVE 2080 and the Iryo 6076, possibly having been traveling under the Lateral Signaling Blocking (BSL) system due to a fault in the LZB system. This circumstance has not yet been confirmed by Adif, although the possible incident in the signaling system and a subsequent human error appear as the main hypotheses about the origin of the accident, after Government sources indicated that the trains resumed circulation under human control following a failure of the automatic safety system. According to the first information, the fault would initially have forced the convoys to stop, before the resumption of rail traffic was authorized through alternative circulation procedures. Always according to the Government, preliminary analyses point to an Adif operator possibly having made a mistake during this human control phase, a circumstance whose relation to the collision will have to be clarified by the official investigation. A possible LZB fault before the accident The LZB (Linienzugbeeinflussung) is a railway protection system that allows the circulation of trains to be continuously supervised and information to be transmitted directly to the equipment installed in the cabs, so that drivers receive indications about the authorized speed, braking distances and the conditions they must respect during the journey. Its use on certain high-speed lines allows the convoys to circulate with constant supervision, especially important when the speeds reached make the distances needed to stop a train considerably greater than those usual in the conventional network. The information known so far points to a fault in this system having forced the circulation conditions to be modified before the accident, although it has still not been specified when the failure was detected, how long it remained out of service or what measures those responsible for rail traffic adopted. What the Lateral Signaling Blocking is and how it works When the automatic protection system associated with the automatic block stops working properly, railway regulations provide for alternative procedures that allow traffic to continue under certain safety conditions, among them Lateral Signaling Block (BSL). Unlike the usual regime of continuous supervision, this procedure uses the signals installed alongside the tracks to regulate the entry of trains into the different block sections, so that each new movement authorization depends on the safety conditions established for the corresponding section being met. The Railway Traffic Regulation establishes that the sections must be free before authorizing certain movements and that the signals must prevent the entry of trains when incompatible movements may occur. The use of this procedure is regulated and does not necessarily imply a loss of safety, although it requires applying the operational conditions provided for situations in which the usual automatic system is not functioning. The Government points to a human error by Adif after the signaling failure The first conclusions being handled by government sources point to the fact that an Adif operator could have made a mistake after a breakdown forced traffic to be managed under human control, a hypothesis that, if confirmed, would make it possible to explain why the safety mechanisms did not prevent the collision. According to this version, the trains were initially stopped when the automatic signaling system failed and were later authorized to continue, although it is still not clear what specific instructions were transmitted or how the movement of both convoys was coordinated. The possible failure would have occurred precisely during that phase of traffic resumption, when the decisions of the traffic controllers acquired special importance as the automatic supervision system was not available in its usual conditions. High-speed service between Madrid and Andalusia interrupted The accident between AVE 2080 and Iryo 6076 took place this Wednesday, October 28, in Urda (Toledo), on the Madrid-Andalusia high-speed line, where the collision caused several carriages to leave the track and part of the train to fall down an embankment. The accident has left fatalities and numerous injured, while emergency services continue attending to those affected and the authorities work to clarify the circumstances of the collision. Adif communicated the suspension of rail traffic between Madrid and Andalucía after reporting “an impact between two trains”, with no official forecast at the moment to restore service. The investigation will have to determine whether the possible failure of the LZB forced a change in the circulation regime and whether, during the subsequent management, the human error pointed to by the first government reports occurred.
Big high-speed rail collision in Spain.
The first information about the circumstances of the Urda (Toledo) railway accident points to the trains involved, the AVE 2080 and the Iryo 6076, possibly having been traveling under the Lateral Signaling Blocking (BSL) system due to a fault in the LZB system. This circumstance has not yet been confirmed by Adif, although the possible incident in the signaling system and a subsequent human error appear as the main hypotheses about the origin of the accident, after Government sources indicated that the trains resumed circulation under human control following a failure of the automatic safety system. According to the first information, the fault would initially have forced the convoys to stop, before the resumption of rail traffic was authorized through alternative circulation procedures. Always according to the Government, preliminary analyses point to an Adif operator possibly having made a mistake during this human control phase, a circumstance whose relation to the collision will have to be clarified by the official investigation. A possible LZB fault before the accident The LZB (Linienzugbeeinflussung) is a railway protection system that allows the circulation of trains to be continuously supervised and information to be transmitted directly to the equipment installed in the cabs, so that drivers receive indications about the authorized speed, braking distances and the conditions they must respect during the journey. Its use on certain high-speed lines allows the convoys to circulate with constant supervision, especially important when the speeds reached make the distances needed to stop a train considerably greater than those usual in the conventional network. The information known so far points to a fault in this system having forced the circulation conditions to be modified before the accident, although it has still not been specified when the failure was detected, how long it remained out of service or what measures those responsible for rail traffic adopted. What the Lateral Signaling Blocking is and how it works When the automatic protection system associated with the automatic block stops working properly, railway regulations provide for alternative procedures that allow traffic to continue under certain safety conditions, among them Lateral Signaling Block (BSL). Unlike the usual regime of continuous supervision, this procedure uses the signals installed alongside the tracks to regulate the entry of trains into the different block sections, so that each new movement authorization depends on the safety conditions established for the corresponding section being met. The Railway Traffic Regulation establishes that the sections must be free before authorizing certain movements and that the signals must prevent the entry of trains when incompatible movements may occur. The use of this procedure is regulated and does not necessarily imply a loss of safety, although it requires applying the operational conditions provided for situations in which the usual automatic system is not functioning. The Government points to a human error by Adif after the signaling failure The first conclusions being handled by government sources point to the fact that an Adif operator could have made a mistake after a breakdown forced traffic to be managed under human control, a hypothesis that, if confirmed, would make it possible to explain why the safety mechanisms did not prevent the collision. According to this version, the trains were initially stopped when the automatic signaling system failed and were later authorized to continue, although it is still not clear what specific instructions were transmitted or how the movement of both convoys was coordinated. The possible failure would have occurred precisely during that phase of traffic resumption, when the decisions of the traffic controllers acquired special importance as the automatic supervision system was not available in its usual conditions. High-speed service between Madrid and Andalusia interrupted The accident between AVE 2080 and Iryo 6076 took place this Wednesday, October 28, in Urda (Toledo), on the Madrid-Andalusia high-speed line, where the collision caused several carriages to leave the track and part of the train to fall down an embankment. The accident has left fatalities and numerous injured, while emergency services continue attending to those affected and the authorities work to clarify the circumstances of the collision. Adif communicated the suspension of rail traffic between Madrid and Andalucía after reporting “an impact between two trains”, with no official forecast at the moment to restore service. The investigation will have to determine whether the possible failure of the LZB forced a change in the circulation regime and whether, during the subsequent management, the human error pointed to by the first government reports occurred.
The CEO explains what the new employee-owned structure looks like, why State of Decay 3 has taken so long, and how the studio is embracing co-development
The CEO explains what the new employee-owned structure looks like, why State of Decay 3 has taken so long, and how the studio is embracing co-development
Right-click menu is completely blank.
Right-click menu is completely blank.
Caché sous les écorces et dans les feuilles des platanes, ce tigre est en fait une punaise qui a colonisé la France à partir de 1975. Dans 4 minutes vous saurez tout sur cet étrange insecte.
Sur cet étrange insecte qui s’accroche à nos vêtements comme un connard mais qui est fort joli regardé à la loupe.
Caché sous les écorces et dans les feuilles des platanes, ce tigre est en fait une punaise qui a colonisé la France à partir de 1975. Dans 4 minutes vous saurez tout sur cet étrange insecte.
Sur cet étrange insecte qui s’accroche à nos vêtements comme un connard mais qui est fort joli regardé à la loupe.
E se fosse Word a non essere compatibile?
La Danimarca ha interrotto un progetto pilota per sostituire Microsoft Office con Collabora. Tra i problemi riscontrati, la compatibilità con i documenti Word.
Ma siamo sicuri di porci la domanda giusta?
Se vogliamo che l’open source sostituisca i prodotti commerciali, dobbiamo pretendere che li imiti perfettamente? Oppure dobbiamo accettare che abbia una propria identità, con formati e modalità di lavoro differenti?
Se vogliamo aprire e modificare documenti DOCX con la massima fedeltà, la scelta più sicura resta Word.
Ma se vogliamo davvero un’alternativa, perché non adottare OpenDocument (ODF) come formato di riferimento?
Immaginiamo per un momento il contrario: un mondo in cui ODF sia il formato dominante e Microsoft Office fatichi a gestirlo correttamente. Diremmo che Office ha fallito?
Forse il problema non è che Collabora non riesca a comportarsi esattamente come Word. È che continuiamo a misurare ogni alternativa con il metro del prodotto da cui vogliamo liberarci.
La sovranità digitale non consiste nel cambiare programma mantenendo intatta la dipendenza dai formati e dalle abitudini del precedente ecosistema.
Non basta dire “passiamo all’open source”. Bisogna anche avere il coraggio di cambiare standard.
Voi che ne pensate?
Fonte: punto-informatico.it/danimarca…
E se fosse Word a non essere compatibile?
La Danimarca ha interrotto un progetto pilota per sostituire Microsoft Office con Collabora. Tra i problemi riscontrati, la compatibilità con i documenti Word.
Ma siamo sicuri di porci la domanda giusta?
Se vogliamo che l’open source sostituisca i prodotti commerciali, dobbiamo pretendere che li imiti perfettamente? Oppure dobbiamo accettare che abbia una propria identità, con formati e modalità di lavoro differenti?
Se vogliamo aprire e modificare documenti DOCX con la massima fedeltà, la scelta più sicura resta Word.
Ma se vogliamo davvero un’alternativa, perché non adottare OpenDocument (ODF) come formato di riferimento?
Immaginiamo per un momento il contrario: un mondo in cui ODF sia il formato dominante e Microsoft Office fatichi a gestirlo correttamente. Diremmo che Office ha fallito?
Forse il problema non è che Collabora non riesca a comportarsi esattamente come Word. È che continuiamo a misurare ogni alternativa con il metro del prodotto da cui vogliamo liberarci.
La sovranità digitale non consiste nel cambiare programma mantenendo intatta la dipendenza dai formati e dalle abitudini del precedente ecosistema.
Non basta dire “passiamo all’open source”. Bisogna anche avere il coraggio di cambiare standard.
Voi che ne pensate?
Fonte: punto-informatico.it/danimarca…
x.com/tama0104/status/2114658304085405852
Character: Flandre Scarlet
x.com/tama0104/status/2114658304085405852
Character: Flandre Scarlet
Alt text: A statue of a Yakshi, but her hand has the OK gesture held below the waist, so you just lost the game.
Image source: …wikimedia.org/…/File:CunninghamBharhut.jpg
Alt text: A statue of a Yakshi, but her hand has the OK gesture held below the waist, so you just lost the game.
Image source: …wikimedia.org/…/File:CunninghamBharhut.jpg
x.com/k4iwa_U/status/2110655867767124423
Character: Yuyuko Saigyouji
x.com/k4iwa_U/status/2110655867767124423
Character: Yuyuko Saigyouji
Connection: Chemical
Connection: Chemical
cross-posted from: lemmy.zip/post/73943891
cross-posted from: lemmy.zip/post/73943891

Emilienne Morin, born on this day in 1901, was a French anarchist and writer who was active in the Spanish Civil War and anti-fascist resistance against Francisco Franco.
In 1931, Morin and her partner, fellow anarchist Buenaventura Durruti, moved to Spain. There, Emilienne was active writing for the Confederación Nacional del Trabajo (CNT) press and took part in anarchist meetings and demonstrations.
With the outbreak of the Spanish Revolution and Civil War, Emilienne joined the Durruti Column on the Aragon Front and worked as secretary at its HQ, where she was in charge of its press department. After the death of Durruti, Morin returned to France to take part in solidarity campaigns for the Spanish anarchists, writing articles and addressing meetings.

Emilienne Morin, born on this day in 1901, was a French anarchist and writer who was active in the Spanish Civil War and anti-fascist resistance against Francisco Franco.
In 1931, Morin and her partner, fellow anarchist Buenaventura Durruti, moved to Spain. There, Emilienne was active writing for the Confederación Nacional del Trabajo (CNT) press and took part in anarchist meetings and demonstrations.
With the outbreak of the Spanish Revolution and Civil War, Emilienne joined the Durruti Column on the Aragon Front and worked as secretary at its HQ, where she was in charge of its press department. After the death of Durruti, Morin returned to France to take part in solidarity campaigns for the Spanish anarchists, writing articles and addressing meetings.
The only good use case I’ve come across is looking at house numbers at night without lighting up the whole house. Generally I’m not a “it’s just fun to see far” kind of person.
And yes, I know there are better performing lights that cost less. I was already making a Wurkkos order and it just fell into my cart.
The only good use case I’ve come across is looking at house numbers at night without lighting up the whole house. Generally I’m not a “it’s just fun to see far” kind of person.
And yes, I know there are better performing lights that cost less. I was already making a Wurkkos order and it just fell into my cart.
Artist: Paulandcookie | pixiv | twitter | artstation | danbooru
Full quality: .png 1 MB (1240 × 1754)
Artist: Paulandcookie | pixiv | twitter | artstation | danbooru
Full quality: .png 1 MB (1240 × 1754)
| Match up | Time | Link |
|---|---|---|
PHI 2 - WSH 5 |
FINAL | LINK |
CGY 0 - EDM 4 |
FINAL | LINK |
NJD 2 - COL 5 |
FINAL | LINK |
TOR 4 - SEA 5 |
FINAL | LINK |
I am open source! Report issues and contribute on my GitHub page!
| Match up | Time | Link |
|---|---|---|
PHI 2 - WSH 5 |
FINAL | LINK |
CGY 0 - EDM 4 |
FINAL | LINK |
NJD 2 - COL 5 |
FINAL | LINK |
TOR 4 - SEA 5 |
FINAL | LINK |
I am open source! Report issues and contribute on my GitHub page!
Meltzer noted that an upcoming boxing card featuring Canelo Alvarez is serving as a benchmark to decide what WWE should do
But if things go wrong during the boxing event, or even after the boxing show, before the next RAW and before Tuesday, WWE might reconsider its next step.
Meltzer noted that an upcoming boxing card featuring Canelo Alvarez is serving as a benchmark to decide what WWE should do
But if things go wrong during the boxing event, or even after the boxing show, before the next RAW and before Tuesday, WWE might reconsider its next step.
From the now pinned [Meta] Getting Bloom County Strips Back On Track
the Bloom County Timeline is currently in shambles. At some point the story line in the book skips around. So, I am going to upload all of the missing strips by month into a single post. The current story line does not actually take place until later on this month, so there will be some repeats.
From the now pinned [Meta] Getting Bloom County Strips Back On Track
the Bloom County Timeline is currently in shambles. At some point the story line in the book skips around. So, I am going to upload all of the missing strips by month into a single post. The current story line does not actually take place until later on this month, so there will be some repeats.
I always wondered how they get shipped.
Apparently (support-) animal welfare prevails
From personal testing I found out that some sharkies do enjoy vacuum sealing for easier private transport, with no indication of damage or quality loss. I originally planned on buying them offline and needed to check how many might fit in my largest backpack. Before testing, I made sure my personal Blahash consented.
(I promised to give them away in our local trans group, so I cannot into blahaj pit space 😭).
I always wondered how they get shipped.
Apparently (support-) animal welfare prevails
From personal testing I found out that some sharkies do enjoy vacuum sealing for easier private transport, with no indication of damage or quality loss. I originally planned on buying them offline and needed to check how many might fit in my largest backpack. Before testing, I made sure my personal Blahash consented.
(I promised to give them away in our local trans group, so I cannot into blahaj pit space 😭).
Testing a crash reporter should be easy: add a switch, kill our app, inspect the result A real iOS device turned that into a different bug when the signal got intercepted before termination We were no longer testing whether crashes were reported We were fixing why the deliberately broken part would not break, which is a strange thing to put in a pull request.
Testing a crash reporter should be easy: add a switch, kill our app, inspect the result A real iOS device turned that into a different bug when the signal got intercepted before termination We were no longer testing whether crashes were reported We were fixing why the deliberately broken part would not break, which is a strange thing to put in a pull request.